Transformers

Power transformers

Substation-class transformers for transmission and large distribution, specified to the impedance, cooling, tap-changing and monitoring arrangement your network needs, and delivered with factory acceptance testing.

The heart of the substation

Power transformers move energy between transmission and distribution voltages at substations, generating plants and large industrial sites. Each one is effectively engineered to order, so the specification, the factory slot and the logistics matter as much as the price.

GovCrest manages that whole chain: specification review, manufacturer selection, factory acceptance testing, heavy-haul transport and delivery to the pad, with one account manager and one contract from award to energization.

Key features

  • Specification review against your one-line and impedance
  • On-load and de-energized tap changer options
  • ONAN, ONAF and forced-oil cooling classes
  • Online monitoring including dissolved gas analysis
  • Factory acceptance testing, witnessed on request
  • Heavy-haul transport, dress-out and oil fill coordinated

Typical specifications

The ranges we source most often. Other ratings, voltages and configurations are available on request.

CapacitySubstation class, from several MVA to large transmission units
High voltageSub-transmission and transmission classes, as specified
CoolingONAN, ONAF, OFAF and multi-stage ratings
Tap changingOn-load tap changer (OLTC) or de-energized tap changer (DETC)
Insulating fluidMineral oil or natural ester
MonitoringTemperature, dissolved gas, bushing and tap changer monitoring
TestingRoutine, design and other tests to IEEE C57.12.90
DeliveryHeavy-haul road or rail, shipped under dry air or nitrogen

Configured to the job

Every site is different. These are the options we specify most often.

01

Generator step-up and auxiliary

Units that connect generation to the grid, and auxiliary transformers for plant loads.

02

Substation and unit substation

Step-down transformers for utility, campus and industrial substations, including integrated unit substations.

03

Mobile and spare units

Spare and mobile transformers to restore service quickly and cover planned outages.

04

Monitoring and controls

Online monitoring, control cabinets and SCADA-ready interfaces specified with the unit.

Where they go

Applications we supply for across federal, state and local projects.

  • Utility and co-op substations
  • Military installation substations
  • National laboratories and research campuses
  • Generating plants and renewables
  • Water and wastewater utilities
  • Large industrial sites
  • Data centers and critical facilities
  • Transit traction power

Standards we specify to

  • IEEE C57.12.00, general requirements for liquid-immersed transformers
  • IEEE C57.12.10, requirements for liquid-immersed power transformers
  • IEEE C57.12.90, test code for liquid-immersed transformers
  • IEEE C57.91, loading guide
  • NEMA TR 1, audible sound levels

Common questions

Straight answers to what engineers and contracting officers ask us first.

How long do power transformers take to deliver?
Lead times for large power transformers are long across the industry and vary by manufacturer and rating. We quote with a factory-confirmed slot, and suggest alternative manufacturers or ratings when that shortens the wait.
What is factory acceptance testing?
Before shipping, each unit is tested at the factory to confirm ratio, polarity, winding resistance, impedance, losses and dielectric strength, among other tests. You can witness the testing, and the report ships with the unit.
Do you handle transport and installation support?
We coordinate heavy-haul transport, delivery to the pad and the manufacturer’s field service for dress-out, oil fill and commissioning checks.
Can you replace an existing unit to match?
Send the nameplate, drawings and test history of the unit being replaced and we source a matching or improved design that fits the existing foundation and connections.
Request a quote

Quote on power transformers

Tell us the rating, voltages and quantity. We come back with pricing, a factory-confirmed lead time and the compliance position, usually within a few business days.

  • Factory-confirmed lead times on every quote
  • Country of origin and compliance stated up front
  • A named account manager within one business day

Transformer quote

Add what you know: rating, voltages, phase and quantity. A one-line or specification can follow by email.

Transformer details

We only use this to reply to you. No newsletter, no list.